Onboard Charger Installation: Mounting, Cooling, Sealing, and CAN Wiring for Commercial EVs
Installing an onboard charger is a vehicle decision, not a parts job. Mounting position, cooling path, sealing, and CAN wiring decide whether the unit holds full power in the field.

An onboard charger is installed as part of the vehicle, not bolted on as an accessory. Mounting position, cooling path, sealing, and CAN wiring decide whether the unit delivers its rated power for its whole service life — and each of those is fixed at installation, not in the datasheet. This guide works through the four decisions with Echelon's integrated power units as the worked example.
A 2-in-1 or 3-in-1 power unit arrives as one enclosure, one mounting position, one cooling path, one set of connections, and one CAN node. That integration is what makes installation simpler than a system assembled from separate parts — and it is also what makes a bad mounting position expensive to fix later, because the whole unit has to move. The checks in this guide belong in the vehicle design before the first unit is ordered, not on the production line after the brackets are welded.
Key takeaways:
- Onboard charger installation is a vehicle decision: mounting position, cooling path, sealing, and CAN wiring are fixed at installation, not in the datasheet.
- Mount the unit where water, heat, and vibration cannot reach it, with service access — an 11kg gross unit is moved once, not twice.
- Cooling is a power question: a 6.6kW charger at 93% efficiency sheds about 500W of heat at full power, and the cooling path must carry it away.
- Sealing is decided at installation: IP67 rates the sealed unit, not the mounting position — only the 6.6kW 2-in-1 and the 1.5kW 2-in-1 are stated IP67.
- Wire the power first — AC input, DC output, DC-DC stage — then the CAN bus, and confirm the DBC file for the exact model number before the first charge.
- The 500W standalone DC-DC converter has no CAN bus: it is controlled by a +12V enable line on a 9-wire harness, not by the vehicle controller.
- Commission with a checklist against the installation drawing and the DBC file, not with a test drive.
Mount the Charger Where Water, Heat, and Vibration Cannot Reach It
The mounting position is the first installation decision, and it constrains the other three. A charger mounted low in the spray path fights water for its whole life; one mounted against a hot component fights heat; one mounted where a technician cannot reach it fights every service visit. The unit's own weight sets the bracket: a 6.6kW 2-in-1 is 11kg gross, a 3.3kW 2-in-1 is 6kg or less, a standalone 6.6kW OBC is 6.5kg, a standalone 3.3kW OBC is 4.3kg, and the standalone 500W DC-DC converter is 1.35kg in a 203.8 × 118 × 57 mm housing. The bracket, the fasteners, and the service access are designed for the exact unit — mounting hole patterns and torque values are programme-specific, so ask for the installation drawing for the exact model number instead of copying a pattern from another unit.
| Unit | Weight | Cooling | Sealing | Control |
|---|---|---|---|---|
| 6.6kW OBC + 1.5kW DC-DC 2-in-1 | 11kg gross | Forced air | IP67 | CAN bus |
| 3.3kW OBC + 1.5kW DC-DC 2-in-1 | 6kg or less | Forced air | Not stated | CAN bus |
| 3.3kW OBC + 1kW DC-DC + PDU 3-in-1 | Not stated | Forced air | Not stated | CAN bus |
| 1.5kW OBC + 500W DC-DC 2-in-1 | Not stated | Air cooling | IP67 | CAN bus |
| 6.6kW standalone OBC | 6.5kg | Air cooling | Not stated | CAN bus |
| 3.3kW standalone OBC | 4.3kg | Air cooling | Not stated | CAN bus |
| 500W DC-DC converter (PD-BA-0F-96Y) | 1.35kg; 203.8 × 118 × 57 mm | Natural cooling | Not stated | +12V enable line, no CAN |
An integrated unit simplifies the mounting decision because there is only one unit to place: one enclosure, one mounting position, one cooling path, one set of connections. A charging system assembled from a separate charger board and a separate DC-DC board needs two mounting positions, two cooling paths, and two sets of connections — and the integration work falls on the vehicle builder. One unit means one bracket and one service position.
Ask for this: the installation drawing for the exact model number — mounting hole pattern, bracket, and service clearance — before the vehicle bracket is designed. A supplier that owns the design has the drawing on file; a build-to-print vendor has nothing to give.
The Cooling Path Decides Whether the Charger Holds Full Power
Cooling is a power question, not a comfort question. Every watt the charger loses becomes heat inside the vehicle, and the cooling path has to carry that heat away or the unit derates. Waste heat follows directly from efficiency: loss is output × (1 ÷ efficiency − 1).
| Unit (OBC stage) | Output | Efficiency | Waste heat at full power |
|---|---|---|---|
| 6.6kW standalone OBC | 6.6kW | 93% or better | About 500W |
| 3.3kW OBC + 1.5kW DC-DC 2-in-1 | 3.3kW | 94% or better | About 210W |
| 3.3kW OBC + 1kW DC-DC + PDU 3-in-1 | 3.3kW | 94% or better | About 210W |
The DC-DC stage adds its own heat on top: the 1.5kW DC-DC stage in the 6.6kW and 3.3kW 2-in-1 units runs at 94% or better, shedding about 100W at full load, and the 3-in-1's 1kW DC-DC stage sheds about 60W. A 6.6kW 2-in-1 at full power is therefore moving roughly 600W of heat through one cooling path — that is why the 6.6kW and 3.3kW 2-in-1 units use forced air, while the standalone OBCs and the 1.5kW 2-in-1 use air cooling and the 500W DC-DC converter uses natural cooling. The cooling path is part of the installation: the air inlet and outlet must stay clear, and the unit must not sit against a heat source that raises its intake temperature.
When the cooling path cannot carry the heat away, the unit protects itself by derating — and the thresholds are stated in degrees, not adjectives. On the 3.3kW 2-in-1, the OBC reduces power at 85°C internal and shuts down at 90°C; the DC-DC stage reduces at 90°C and shuts down at 105°C. A charger that derates on a hot day is not faulty; it is installed where its cooling path cannot do its job. The 6.6kW 2-in-1 is rated from −40°C to +55°C, which is the ambient range the unit is designed for — the installation must keep the air reaching the unit inside that range.
For the choice between air and liquid cooling at the vehicle level, see Air Cooling vs Liquid Cooling for OBC. That comparison decides the cooling architecture; this guide assumes air cooling is chosen and works through what the installation must provide for it.
Ask for this: the derating curve with thresholds stated in degrees for the exact model number, and the airflow requirement for its cooling path. Both belong in the installation drawing package.
Sealing Is Decided at Installation, Not on the Datasheet
IP67 rates the sealed unit, not the mounting position. A unit sealed to IP67 still fails early if it sits in standing water, if its connectors face upward into spray, or if its cable entries trap water against the seals. Only two Echelon units carry a stated IP67 rating — the 6.6kW OBC + 1.5kW DC-DC 2-in-1 and the 1.5kW OBC + 500W DC-DC 2-in-1 — and the rating is a property of the unit as delivered, not a promise about any place on the vehicle. The mounting position decides how much water the unit actually sees, which is why water-ingress failures on utility vehicles are so often solved by moving the charger rather than by changing the charger.
Three installation habits decide sealing in practice. First, keep the unit out of the direct spray path and out of standing water — height and shielding matter more than the rating number. Second, route connectors so water drains away from them instead of pooling at the seal; a connector facing down sheds water, a connector facing up collects it. Third, check the seals at installation: connectors fully seated, cable entries dressed so the harness does not pull on the seal, and no cable routed where it chafes against a sharp edge. None of these is a product specification — all of them are installation work, and all of them are verified by inspection, not by the datasheet.
What IP ratings, temperature, vibration, and salt spray actually mean for a commercial EV is covered in the site's validation guide — "IP67, −40°C, and Automotive Validation Explained" — and this guide does not repeat that explanation. The installation question is narrower: given the rating the unit carries, where on the vehicle does it stay dry enough to keep it?
Ask for this: the sealing rating for the exact model number, and the mounting guidance that goes with it — where the unit may sit, and where it must not.
Wire the Power First: AC Input, DC Output, and the DC-DC Stage
Power wiring comes before signal wiring, because the power connections decide the cable runs and the connector positions. Four connections carry power on an integrated unit: AC input, DC output to the battery, DC-DC output to the 12V system, and — on the 3-in-1 — the PDU outputs to the vehicle's high-voltage loads.
| Connection | What it carries (verified) | What to confirm at install |
|---|---|---|
| AC input | 90–264Vac; 6.6kW delivers 6.6kW at 220Vac and 3.3kW at 110Vac; 3.3kW delivers 3300W at 220Vac and 1650W at 110Vac | Supply voltage at the vehicle's charging locations, and the 110Vac derating if the vehicle charges on 110V |
| DC output to battery | 96V platform 60–128Vdc; 320V platform 195–450Vdc; 48V and 72V on the 1.5kW 2-in-1 | Platform matches the battery — a voltage step is a new unit, not a re-rating |
| DC-DC output (12V system) | 9–16V; 6.6kW 2-in-1: 110A rated / 132A peak, 1500W; 3.3kW 2-in-1: 110A / 132A peak, 1.5kW; 3-in-1: 72A / 86A peak, 1kW; 1.5kW 2-in-1: 500W | Simultaneous auxiliary loads against the DC-DC rating — the 12V loads run while the vehicle charges |
| PDU outputs (3-in-1 only) | High-voltage distribution to PTC heating, air conditioning, and vehicle power systems | PDU layout: which load each output feeds, and the protection for each branch |
Cable gauges, connector part numbers, and routing clearances are programme-specific — they depend on the vehicle's harness layout, not on the charger alone — so this guide states none of them. They belong in the installation drawing for the exact model number, together with the mounting pattern. What the installer must confirm from that drawing is simpler: each power connection lands on the right circuit, the harness runs are as short as the layout allows, and no power cable runs where it chafes, overheats, or blocks the cooling path.
Ask for this: the installation drawing for the exact model number, with the power connections, the harness routing, and the PDU layout where the unit has one.
Wire the CAN Bus Last, and Confirm It Before the First Charge
Signal wiring comes after power wiring, because the CAN bus is what tells the charger what to do — and a charger wired to the wrong signals charges the wrong way. Every integrated Echelon unit carries a CAN bus, and the interface is defined by the DBC file and CAN matrix for the exact model number: the signals the vehicle controller expects, enable and wake-up behaviour, and fault reporting. On the 1.5kW 2-in-1, charging voltage, charging current, and CAN are configurable for OEM projects — the configuration is set for the programme before the first charge, not discovered during it.
One unit is the contrast case, and it matters: the standalone 500W DC-DC converter (PD-BA-0F-96Y) does NOT support CAN. It is controlled by a +12V enable line on a 9-wire harness — the vehicle tells it to run by pulling the enable line high, and there is no DBC file, no CAN matrix, and no fault reporting over the bus. An installer who expects CAN control from that unit will wait for messages that never arrive. The rule is simple: check the control interface per unit, not per product family, because two units in the same vehicle can be controlled two different ways.
For the message-level detail — what the CAN checklist covers, which messages, baud rate, wake-up, diagnostics, and fault handling — see CAN Communication and BMS Integration Checklist for OBC. That checklist owns the communication depth; this guide owns the wiring order and the confirmation step. The installation question is narrower: is the DBC file for the exact model number on file, is the CAN configuration set for this programme, and does the vehicle controller see the charger on the bus before charging starts?
Ask for this: the DBC file and CAN matrix for the exact model number, and the configured charging voltage and current for the programme — in writing, before the first charge.
Commission the Installation with a Checklist, Not a Test Drive
Commissioning is a checklist against documents, not a drive around the block. A test drive proves the vehicle moves; it proves nothing about whether the charger is installed correctly. Each check below is confirmed against a document the supplier should already have on file.
| Check | What confirms it | Evidence to ask for |
|---|---|---|
| Voltage platform matches the battery | Model number and nameplate against the battery range | Installation drawing for the exact model number |
| CAN configured for the programme | Charging voltage, charging current, and CAN set for this vehicle | DBC file and CAN matrix; configured sample |
| Cooling path clear | Air inlet and outlet unobstructed; unit clear of heat sources | Installation drawing; derating curve |
| Sealing inspected | Connectors seated; mounting position clear of direct spray and standing water | Sealing rating for the exact model number; mounting guidance |
| Derating thresholds known | Reduce and shutdown temperatures on file for the unit | Derating curve with thresholds in degrees |
| First charge observed | Charges at the configured voltage and current; faults reported on CAN | Configured sample; test report for the exact model number |
If any row cannot be confirmed, the installation is not finished — the vehicle is not ready for its first charge. The most common gap is the second row: the CAN configuration was never set for the programme, so the charger runs on default settings that do not match the battery. The second most common is the third: the cooling path was clear on the drawing and blocked on the vehicle, by a harness, a bracket, or another component fitted after the charger. Both are found by the checklist, and neither is found by a test drive.
Related Echelon Products
6.6kW onboard charger with a 1.5kW DC-DC converter (9–16V, 110A rated / 132A peak) in one integrated module for 96V and 320V platforms, sealed to IP67 and rated from −40°C to +55°C, with CAN-bus communication and forced-air cooling.
3.3kW onboard charger with a 1.5kW DC-DC converter (1.5kW / 1800W peak, 9–16V, 110A / 132A peak) in one integrated module for 96V and 320V platforms, with CAN-bus communication, forced-air cooling, and derating thresholds stated in degrees.
Integrated power solution for 96V and 320V platforms: 3.3kW OBC (60–128Vdc, 0–34A), 1kW DC-DC (9–16V, 72A), and high-voltage PDU in one unit, with CAN-bus communication and full protection. The PDU distributes high voltage to PTC heating, air conditioning, and vehicle power systems.
Frequently Asked Questions
What is the first thing to decide when installing an onboard charger?
The mounting position. It decides how much water, heat, and vibration the unit sees, and whether a technician can reach it for service. Mount the unit where water, heat, and vibration cannot reach it, with service access — and confirm the position against the installation drawing for the exact model number before the vehicle bracket is designed.
Does an onboard charger need airflow, or is the housing enough?
It needs a cooling path. A 6.6kW charger at 93% efficiency sheds about 500W of heat at full power, and a 3.3kW unit at 94% sheds about 210W — plus about 100W from a 1.5kW DC-DC stage. The 6.6kW and 3.3kW 2-in-1 units use forced air; the standalone OBCs and the 1.5kW 2-in-1 use air cooling; the 500W DC-DC converter uses natural cooling. The air inlet and outlet must stay clear, and the unit must not sit against a heat source.
Is an IP67 onboard charger waterproof wherever it is mounted?
No. IP67 rates the sealed unit, not the mounting position. A unit sealed to IP67 still fails early if it sits in standing water or its connectors face upward into spray. Only the 6.6kW OBC + 1.5kW DC-DC 2-in-1 and the 1.5kW OBC + 500W DC-DC 2-in-1 carry a stated IP67 rating — the rating is a property of the unit as delivered, not a promise about any place on the vehicle.
How is an onboard charger wired to the vehicle?
Power first, then signals. AC input (90–264Vac), DC output to the battery (96V or 320V platform, 48V or 72V on the 1.5kW 2-in-1), DC-DC output to the 12V system (9–16V), and — on the 3-in-1 — PDU outputs to PTC heating, air conditioning, and vehicle power systems. Then the CAN bus, defined by the DBC file and CAN matrix for the exact model number. Cable gauges, connector part numbers, and routing clearances are programme-specific and belong in the installation drawing.
What is the difference between CAN control and an enable line?
CAN control means the vehicle controller talks to the charger over the bus using the DBC file — charging voltage, charging current, and CAN are configurable for the programme. An enable line means the vehicle tells the unit to run by pulling a +12V line high, with no messages and no fault reporting over the bus. The standalone 500W DC-DC converter (PD-BA-0F-96Y) works this way: a 9-wire harness with a +12V enable line, no CAN bus. Check the control interface per unit, not per product family.
What should the installer check before the first charge?
Six checks, each against a document: voltage platform matches the battery; CAN configured for the programme; cooling path clear; sealing inspected; derating thresholds known; first charge observed at the configured voltage and current with faults reported on CAN. If any row cannot be confirmed, the installation is not finished.
Next Step
Send the Echelon team the programme inputs — the battery voltage platform, the mounting position and cooling path available on the vehicle, the CAN protocol, and the simultaneous auxiliary loads — and ask which integrated power unit fits, what the installation drawing shows for it, and what validation evidence comes with it.
Contact Echelon directly: Email nancy@tici-energy.com · WhatsApp +86 18114665311.
Use the contact form on the contact page to start the discussion, and see how a custom programme is scoped on the OEM/ODM page.
